Investigation of the Long-Term Performance of an Industrial-Scale Biogas Upgrading Plant with Grid Supply Applying Gas Permeation Membranes

  • Posted on: 11 June 2018
  • By: mmiltner
TitleInvestigation of the Long-Term Performance of an Industrial-Scale Biogas Upgrading Plant with Grid Supply Applying Gas Permeation Membranes
Publication TypeJournal Article
Year of Publication2010
AuthorsMiltner M, Makaruk A, Harasek M
JournalChemical Engineering Transactions
Volume21
Pagination1213-1218
Abstract

Within this work, the design and first experiences in long-term stability of an industrial scale biogas upgrading plant are presented. This plant supplies 100m³(STP)/h of biomethane to the natural gas grid and is based on the gas permeation membrane process. The investigation of the long-term performance stability is supported by means of detailed numerical process simulation. It can be shown, that the application of an adequate gas pretreatment leads to a prevention of membrane deterioration and to a significant enhancement of the overall plant durability.

URLhttp://www.aidic.it/cet/10/21/203.pdf
DOI10.3303/CET1021203